Are you worried about a bathing slip and fall of yourself or a loved one? According to this NIH and CDC study, you should. Bathrooms are the 2nd most dangerous room in the home:
235,000 people are admitted to ER’s each year for bathroom falls
79% of bathroom-related injuries occur to individuals over 65
23,055 injuries “getting out of tub/shower”
5,062 injuries “getting into tub/shower”
Falls are the leading cause of fatal and nonfatal injuries over 65
The average monthly cost for assisted living is $5,190. For the cost of 3-4 months in assisted living, you could greatly reduce one of the riskiest parts of being in your home, bathing. By Stepping into Safety and Transforming your tub to an Easy-Access Shower, you may very well prevent the slip and fall of yourself or a loved one. Don’t wait for that to happen! Reach out to us today!
Step into Safety: Transform Your Tub to an Easy-Access Shower.
What will this cost me? Here are some recent customer examples:
Top-Whirlpool tub conversion (electrical move) to low step walk in Onyx shower with Delta grab bars, Moen fold down seat, Delta shower system, and Kohler shower door, all fixtures in chrome: $17,593.
2nd row from top- Fiberglass tub conversion to low step walk in Onyx shower with Delta grab bars, Moen fold down seat, Delta shower system, and Kohler shower door, all fixtures in brushed nickel: $16,947.
3rd row from top- Fiberglass tub conversion to low step walk in Onyx shower with Delta grab bars, Moen fold down seat, Delta shower system, and Signature Hardware shower curtain rod, all fixtures in oil rubbed bronze: $15,412.
Bottom: Cast iron tub with tile walls conversion to low step walk in Onyx shower with Delta shower system, and Kohler shower door, all fixtures in chrome: $16,184. (Entire bathroom remodel- $28,756)
Our simple process to get your old tub out and a new Easy-Access Shower in:
1. Call, Text, Email, Schedule an appointment or a call to discuss your specific needs.
2. We set up an appointment at your house to measure, look at Onyx samples and fixture options (shower door, shower head, hand held shower, fold down seat, grab bars, etc) and decide what your finished shower will look like and include.
3. You sign off on the final estimate, pay the deposit (check, cash, credit card) and we place the order with our preferred vendors. The average lead time from material order date to starting a shower remodel is 2 months.
4. When we start your project, we will create a covered pathway from the exit to the shower to protect your floors. 3-5 days from start to completion.
5. Once we complete your project we will clean our work area and pathway, then go over how to operate and care for your new shower. Lastly, collect the remaining balance (check, cash, credit card).
Get in touch.
We'd love to hear from you! Get in touch to discuss your project and see how we can help.